NICEIC approved  ·  Electricians across Merseyside & surrounding areasCall0151 792 3243Email[email protected]Get a free estimate

Distribution Board Replacement

Old, overloaded or non-compliant boards replaced with new, properly labelled distribution boards, planned so your business keeps running.

  • NICEIC approved
  • Work planned around your hours
Leisure industryBoard modernisation
Single & three-phaseBoards of all sizes
LabelledCircuit charts & schedules
5.0 ★From 128 Google reviews

Before & after

Leisure site board modernisation

Leisure site after Leisure site before BeforeAfter
Leisure industryDistribution board modernisation

Leisure site

Old boards stripped out and replaced with new, properly labelled distribution boards on a busy holiday village. Drag the slider to see the difference.

Signs it’s time

Does your board need replacing?

Old boards slow you down and can leave you exposed.

Old or damaged

Boards past their best or showing wear.

No spare ways

No room for new circuits or equipment.

Nuisance tripping

Circuits trip and stop work.

Failed EICR

Codes on your report that need sorting.

New equipment

Machinery, EV chargers or extra load.

No labels

Nobody knows which breaker does what.

What’s included

A board change, planned properly

We plan the changeover with you so the power is off for as short a time as possible, out of hours if needed.

  • Survey and load check
  • Single and three-phase boards
  • Changeover planned around your business
  • Surge protection where required
  • Every circuit tested, labelled and charted
  • Certificate and paperwork for your records

How it works

From survey to switch-on

Site visit & estimate

We look at the job properly and give you a clear written estimate.

Planned around you

Dates and times that suit you, including early starts, evenings or weekends.

Installed properly

Tidy, labelled work to the current regs, made safe and cleaned up daily.

Tested & certified

Everything signed off, with certificates for your records and your insurer.

What our customers say

5.0 on Google

Read our commercial reviews
CCTV installation
“Outstanding from start to finish. Expert knowledge and precision in every aspect. Tidy, polite and fantastic service. Love my new CCTV setup.”
Prescot FencingGoogle review
Repeat customer
“Michael and his team carried out their work professionally and considerately. They are trustworthy and price themselves fairly. I wouldn't ask any other contractor if I needed work doing.”
Keith C.Google review
Tricky job
“The job Michael quoted for actually became more complicated when started. However all got sorted without any fuss or stress. It is vital to have confidence in your tradespeople and Michael and Liam fill you with it.”
Klee M.Google review
Repeat customer
“Have had Maxim in a few times over the years and the work is always to a high standard. Everything is explained and communicated really well, and options are always given. Would highly recommend.”
Graeme H.Google review
Troubleshooting
“Resolving problems previous contractors had left. Michael is professional, attends when he says he will. They leave the job finished to a high standard and tidy up afterwards too.”
Judith M.Google review
Long-term customer
“Mike and Liam have been our electricians for years. Wouldn't trust anyone else.”
Phil T.Google review

Questions

Distribution board FAQs

Can’t see your question? Give us a ring on 0151 792 3243.

How long will the power be off?

It depends on the size of the board. We plan the changeover with you and can do it out of hours to keep you trading.

Do you do three-phase boards?

Yes. We replace single and three-phase distribution boards for offices, shops, factories and leisure sites.

Will our circuits be labelled?

Yes. Every circuit is tested, labelled and recorded on a schedule, so you know exactly what’s what.

Do we get a certificate?

Yes. You get full test results and a certificate for your records and your insurer.

Free, no-obligation estimate

Need a board replaced?

Tell us about the job and we’ll arrange a site visit and a clear, written estimate.

Request a board estimate